Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13600866

- Product Categories
- Friendly Links
Information Name: | Booth manufacturers | Strong Sheng door industry | Taiyuan booth |
Published: | 2014-11-10 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | Booth manufacturers | Strong Sheng door industry | Taiyuan booth provided by Wanbailin district-Sheng distribution of stainless steel products. Booth manufacturers | Strong Sheng door industry | Taiyuan booth is Wanbailin district-Sheng Stainless Steel Products Distribution Division (www.sxqsmy.net) launched this new upgrade, the above picture is only for reference, please call or pictures on this page contact telephone number, to obtain the latest information, contact: Weijing Li. Booth installation: 1, excavations earth excavation by mechanical excavation to the design elevation above 200mm high, the use of artificial trimming pick the bottom. When digging through the design elevation drill exploration carried out after the response to pit and found soft soil should be removed to a good part of the application twenty-eight overbreak soil dust layered backfill compaction to the design elevation. 2, basal posterior groove when after digging through the design elevation, please construction units, design units, supervision unit inspection and acceptance, pouring concrete pads immediately after the multi-signature recognition. 3, the construction schedule booth construction-based security guard post in two steps, the first step in construction of the foundation booth, the second step construction of ground beams, after the foundation bearing capacity does not meet the requirements of Gravel Excavation compacted powder then fill handle Shanxi exchange booth, In other fill depth of 600mm, width of Replacement based on each side + 200mm booth maintenance, for filling foundation bearing capacity requirements of the standard value of the processed reach 180kpa. 4, steel processing 1), before the steel used must witness the sampling and testing center to send qualified before use. 2), steel processing with two sets of steel processing machinery. 3), before the steel cutting, must be in strict accordance with the design, construction specifications prepared by steel ingredient list, and sent the project department audit. When cutting steel, welded steel should consider the length of time of the loss. 4) reinforcement in the field concentrated ingredients, primarily in the field molding, reinforced by the models listed, classified stacking. Stirrups according to specifications, size classification neatly stacked. Booth decoration decorative works should have inserted after the main structure of the sub-acceptance. Before the formal operations should strictly enforce the existing construction and acceptance issued by the State to ensure the construction quality. First pop-up control ink line vertical and horizontal directions, and make a model and model, please construction units and design units comrades after watching a model, then a large area expanded. Special attention should be interspersed with the various types of work between the construction to be careful, careful operation, not gifted not on. Note decorative detail treatment works, improve product protection work. |
Admin>>>
You are the 12943 visitor
Copyright © GuangDong ICP No. 10089450, Wanbailin district-Sheng Stainless Steel Products Distribution Division All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 12943 visitor
Copyright © GuangDong ICP No. 10089450, Wanbailin district-Sheng Stainless Steel Products Distribution Division All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility