Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13600866

- Product Categories
- Friendly Links
Information Name: | Booth manufacturers | strong Sheng door industry (certified) | Datong booth |
Published: | 2014-11-25 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | Booth manufacturers | strong Sheng door industry (certified) | Datong booth provided by Wanbailin district-Sheng distribution of stainless steel products. Wanbailin district-Sheng Stainless Steel Products Distribution Division (www.sxqsmy.net) is specialized in the "garage doors, Continental doors, fire doors, stainless steel doors, engineering doors, building doors, retractable door" of enterprises, companies adhering to the "integrity management, service intentions, "the idea, to provide you with the highest quality products and services. Welcome to inquire! Contact: Weijing Li. Booth construction points: brickwork 1) The project is supported by the foundation to the brick foundation beam. 2) pre-wall masonry, brick two days in advance watering wet, non-dried brick wall. After the brick foundation ground beams pouring finished surface is clean, and the walls in the upper elastic axis line, bottom brick paving Barrier booth, stand a good number of rods skin. When the bottom of the brick paving, a high level to be adjusted according to the standard point at the bottom of the mortar thickness (with fine aggregate concrete leveling if necessary) to ensure that the upper level of a brick wall. 3) When the wall masonry, mortar to be full, mortar joint control between 8-12mm. Mortar Mix formulated in strict accordance with the laboratory, with the mix with the puzzle. Brick uses to track inspections of the wall flatness, squareness, gray seam uniformity and mortar plumpness, promptly corrected. 4) tie bar set up one set per 500mm, wall set up a structural columns per 3m, tie bar extends into the wall 1000mm. Tie bar and column connections using the template in advance by location along the lateral embedded steel, steel booth and mark the position, when masonry chisel concrete surface marked by direct modulation, curved hook shape; the top of the structural columns using the beam bottom Methods embedded steel plate welded connections. To do: According to drawings planned in advance by class embedded steel section booth, determine the location of the booth steel procurement, using 8mm thick steel Q235, cross-section a (beam width - the protective layer thickness) × b (1.2 times the structural columns along the beam direction section length), close to the wooden template placed well plate with nails nailed both ends, and then with a fixed spot beams reinforcement. 5) brick in strict accordance with the new regulatory requirements, sub-master projects and general projects. Decoration works construction program should be: roof and interior plaster ceiling dome → → → ground floor exterior decorative plaster plaster installation → → sash and other paints and glass installation → outdoor bulk water level and other procedures. Interior plaster interior plaster should be structured after the acceptance and completion of infill walls. 1), primary treatment process? Dozen banana out of the column? Wipe Corner? Wetted wall? Wiping rough bottom ash? Inserted into the ceiling, floor construction? Moist walls? Wipe gray overcoat. 2), construction points ①, primary treatment: first dust substrate surface, dirt and grease and other cleaned and watering wet asphalt hemp will between the door frame and the wall of the seam stuffer tight, and with cement mortar embedded complement dense, while The hole slot after scaffold eye and utilities underground pipe installation layered tamped fill level, the concrete surface wash or cutting hair. ②, check the flatness of the wall surface and vertical, and with the same ingredients mortar hit the plaster layer thickness of the Israeli-Palestinian control plaster. Tapah from the four corners of the room were playing vertical lifting bar, a banana every 1.2--1.5m playing son, carried out the post after sub-para mortar solidified column on both sides should be cut neatly, and leveling layer on the surface of the column with Pakistan flat, then overcast with cement mortar to do the door and wall angle, corner Corner column. Corner height of more than 2m, the width of each side to take 50mm. Corner for survival at times, that is twice rough gray, gray overcoat again. ③, wiping rough bottom ash: Before watering wet plaster walls, pre-mixed mortar pointing and repair missing flute off angle. To force TROWELING plaster, mortar squeeze The gaps in reach rough gray and grassroots closely purposes. ④, wiping middle rough gray: After wiping the bottom of the middle rough rough solidified ash gray, stratified fill wipe with a long catch scraping feet flat, yin and yang, yin and yang Square corner with straight, then rub with a wooden trowel flat surface, do to the surface of the hair, the wall flat, straight edges and corners. Rough gray wall finish after partial modification, the inspection before making a gray overcoat and overlay. ⑤, plastering parts of different materials at the junction of steel wire nails on each side of not less than 200mm. |
Admin>>>
You are the 12943 visitor
Copyright © GuangDong ICP No. 10089450, Wanbailin district-Sheng Stainless Steel Products Distribution Division All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 12943 visitor
Copyright © GuangDong ICP No. 10089450, Wanbailin district-Sheng Stainless Steel Products Distribution Division All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility